(1 / 1)
Date: March 03, 1986 13:32
From: KIM::FRYE
To: @SYS$MAIL:JUNK
ENGINEERING WAS SELECTED TO DO A "HEAT TEST" ONN OUR NEW HOT WATER HEATER INSTALLED AT THE COFFEE STATION LOCATED BY THE ENGINEERING CONF. RM. IT'S BEEN A WEEK AND A HALF SINCE THE HEATER WAS INSTALLED... WHAT'S THE VERDICT? IS IT DOING THE JOB?... CAN I GET SOME FEED BACK?... THE OTHER COFFEE STATIONS ARE WAITING THE OUTCOME... THANKS AGAIN...BOB
Mar 03, 1986