Date: January 13, 1992 11:13
From: KIM::DURFEY
To: MARGOLIN
From: KIM::DOWNEND 13-JAN-1992 10:36:10.58 To: CRAVER,BJORKQUIST,MCCARTHY,MONCRIEF,RAY,LEE,HUBBERSTEY,JMOORE,DROBNY CC: NGUYEN,KHODADADI,MCNAMARA,DURFEY,MOORE Subj: Proto-Assy overload Emmette is overloaded especially with Karen out (bad back). I expect Karen back 1/16/92, but only at partial speed. I plan to get someone over here from Mfg. on 1/16/92 to help out (I want Karen to be the interface rather than bogging down Emmette with training someone). Pat, please prioritize the task shown below for completion between now and 1/31/92 (the next 3 weeks). Let's give the (2) multi-sync IIa PCB's highest priority since that is what Emmette is doing now. Here is a list of work to do in Proto NOW: GX2 for Moto, Space (Lee) - 1 board stuffed, need 16 pin sockets, then is will be wave-soldered on 1/13/92. (Mercieca is getting the sockets). -12 more PCB's in the box - HOW many more need to be stuffed by 1/31? (2 for Moto, 2 for Space, xx for ??) Multi-sync IIa (Margolin) - 2 boards being stuffed 1/13/92 -23 more blanks PCB's in the box; Trainer is primary immediate need after the first 2 for Jed. Warrior (Lee) - 15 completed PCB's in Proto - need resistor changes (about 5 per PCB). Relief Pitcher (JMoore) - 3 Relief Piggyback stuffed - 3 more blank PCB's need to be stuffed by 1/31; - 3 more blank PCB's need to be stuffed by 2/15. Space (Lee/Drobny) -Cables, connectors, wirewraps for the lab set-up. P.S. Thank you to Cris Drobny for bringing to my attention.
(2 / 2)
Date: January 28, 1992 14:06
From: KIM::DOWNEND
To: BJORKQUIST, RAY, MONCRIEF, DURFEY, MARGOLIN, COPPERMAN
CC: MCCARTHY, MOORE, DOWNEND, KHODADADI, NGUYEN, DROBNY, MCNAMARA
As of 1/28/92, Emmette has delivered (11) stuffed Multi-sync PCB's to Applied Research. He has 8 more to do. John Ray says that TRAINER needs one working PCB and that will hold them for the next few weeks. Margolin says that he needs one with the VRAM sockets (Erik just got the boards back from surface mount vendor). So the plan for Emmette is: a) Start and complete a PCB with VRAM sockets (from Erik) by 2/3/92 b) Set aside Partially finished board - resume in a few weeks c) Set aside the 7 blank boards for a few weeks By 2/3/92 we will have 12 completed Multi-sync II's (one w/VRAM sockets) and 8 more to do. Proto-assy will resume stuffing Multi-sync II's the week of 2/24. Alternatively, when Karen is back 100% and she can supervise an assembler from Mfg. to assist in completing the PCB's, then we will start the PCB's sooner. With only Emmette full-time in proto-assy, it's prudent to allocate the resource more evenly. This will allow Emmette to complete several other tasks pending in proto assy.
Jan 13, 1992