Date: March 23, 1987 10:36
From: KIM::FRYE
To: @SYS$MAIL:JUNK
Tomorrow, 3/23 Cal-Air will be in our building to work on our A/C system. They will be installing a transfer system for the main lobby which should correct our door closing problems. The main door between design services and the lobby may be blocked off for a while to complete this work. The second work area involves enineering, just outside the conference room, through Gary Stempler's office, the printer room and into the computer room. A return duct will be installed down the hallway in front of the printer room. Cal-Air is sensitive to our engineering routine and will make every efford to complete this job with the least amount of disruption and are hoping for completion in one day. Thanks, Bob